Gantt, SC Elevation & Topographic Map

Elevation
1,020 ft 310 m960 ft 295 m940 ft 285 m880 ft 270 m830 ft 255 m800 ft 245 m
Contours every 100 ft, bold every 500 ft
USGS 3DEP · U.S. Census Bureau
How to use this mapviews, tools and data
- Elevation
- Ground colored by height from green (lowest) to white (highest), with contour lines every 40–500 ft (USGS data).
- Satellite
- A 2016 satellite photo at 33 ft (10 m) detail; contours off.
- 3D
- Tilt and turn the terrain; hills are raised 1.5×, or set ×1 for true height.
- Click or tap anywhere
- The exact elevation of that spot in ft and m.
- Measure
- Pick two points for the climb, descent and grade along a straight line.
- Area
- Fades everything outside the official CDP boundary (US Census).
Elevation Data
Gantt sits at about 910 ft (275 m) above sea level, worked out from 2020 Census block heights on USGS 3DEP, weighted by residents.
Typical elevation
910 ft 275 m
most residents: 880–960 ft
Lowest
800 ft 245 m
on the south side
Highest
1,020 ft 310 m
near the middle
Average
920 ft 280 m
all land inside the CDP boundary
Gantt spans about 220 ft of height, so no single spot tells the whole story. The ruler shows where its people live, and where the other numbers you'll see come from.
| Figure | Elevation |
|---|---|
| Typical Where people live: half of residents higher, half lower | 910 ft275 m |
| Highest point Inside the CDP boundary, near the middle | 1,020 ft310 m |
| Lowest point Inside the CDP boundary, on the south side | 800 ft245 m |
| Town center USGS map point for Gantt | 980 ft300 m |
| Airport (GSP) FAA airport elevation, the highest point of its runways, 10 mi northeast of the CDP boundary | 964 ft294 m |
| Average of all land | 920 ft280 m |
Elevation profile, west to east
3.1 mi west to east through the town center.
Topographic Map
- Location
- Unincorporated community (census-designated place) in Greenville County, South Carolina, United States
- Population
- 14,970 2020 Census
- Land area
- 9.6 sq mi
- Density
- 1,568 per sq mi
- Coordinates
- 34.8001° N, 82.4243° W
- Time zone
- Eastern UTC−5 / −4
- Landform region
- Piedmont
- Drains to
- Saluda River → Santee River → Atlantic Ocean
- Airport
- Greenville Spartanburg International (GSP) 964 ft
- ZIP codes 2
- 29605 29673
⤓ Download this map
WebP, 1200 × 900. Free to use: credit “ElevationOf.com” with a link to this page.
Sources: U.S. Census Bureau, USGS, FAA
Nearby Places
Nearby towns by typical elevation
- Sans Souci1,000 ft
- Parker990 ft
- Judson990 ft
- City View980 ft
- Greenville960 ft
- Welcome950 ft
- Dunean950 ft
- Powdersville910 ft
- Gantt910 ft
- Golden Grove870 ft
- Conestee840 ft
Rankings by typical elevation
- Towns in South Carolina33rd highest of 475
- Towns in Greenville County16th highest of 24
Peaks and hills nearest, by height
- Paris Mountain2,045 ft
- Piney Mountain, Greenville County1,360 ft
- Roper Mountain1,198 ft
- Butler Hill1,190 ft
- Indian Hill, Greenville County810 ft
How we measure
- Typical elevation: the population-weighted median: every 2020 Census block inside the CDP boundary, at its USGS 3DEP height, weighted by the people who live there. Half of residents live higher, half lower.
- Lowest, highest, average: USGS 3DEP bare-earth heights on a 1 arc-second (≈100 ft, 30 m) grid, land only, inside the Census CDP boundary (TIGER, Jan 1 2026).
- Nearby Places: nearby towns and rankings use each town's typical elevation, so every town is compared like for like. Rankings count every city, town, township and census-designated place, including places inside a town. Peaks and hills: the nearest summits with at least 980 ft (300 m) of prominence within 62 mi (100 km), then federal (GNIS) summits within 16 mi (25 km) when there are fewer than 5; each is the 3DEP top on a ~7 ft (2 m) window, or the NGS published height when a usable survey mark sits within 160 ft (50 m) of it (shown as published).
- Rounding: computed heights are rounded to 10 ft (5 m), or to 1 ft (1 m) under 100 ft; 3DEP is good to about a meter, not a foot. Published figures (FAA airport elevation, NGS survey heights) are shown as their publisher gives them.
- Datum: North American Vertical Datum of 1988 (NAVD 88). NGS plans to replace NAVD 88 with a new datum (NAPGD2022); heights will then shift slightly.
- Gantt is an unincorporated community; figures cover the census-designated place, a statistical area.
- Sources: USGS 3DEP, GNIS, Watershed Boundary Dataset and physiographic provinces; U.S. Census Bureau (boundaries, 2020 blocks, Gazetteer areas, ZIP code areas); FAA airport data; BTS time zones; NOAA NGS survey heights. All public domain.