Gantt, AL Elevation & Topographic Map

Topographic elevation map of Gantt, Alabama, shaded from 180 ft on the south side to 280 ft on the northwest side
Elevation
280 ft 85 m260 ft 80 m240 ft 75 m220 ft 65 m190 ft 60 m180 ft 55 m
Contours every 40 ft, bold every 200 ft
USGS 3DEP · U.S. Census Bureau
How to use this mapviews, tools and data
Elevation
Ground colored by height from green (lowest) to white (highest), with contour lines every 40–500 ft (USGS data).
Satellite
A 2016 satellite photo at 33 ft (10 m) detail; contours off.
3D
Tilt and turn the terrain; hills are raised 1.5×, or set ×1 for true height.
Click or tap anywhere
The exact elevation of that spot in ft and m.
Measure
Pick two points for the climb, descent and grade along a straight line.
Town area
Fades everything outside the official town limits (US Census).

Elevation Data

Gantt sits at about 230 ft (70 m) above sea level, worked out from 2020 Census block heights on USGS 3DEP, weighted by residents.

Typical elevation
230 ft 70 m
most residents: 200–240 ft
Lowest
180 ft 55 m
on the south side
Highest
280 ft 85 m
on the northwest side
Average
230 ft 70 m
all land inside town limits

Gantt spans about 100 ft of height, so no single spot tells the whole story. The ruler shows where its people live, and where the other numbers you'll see come from.

FigureElevation
Typical
Where people live: half of residents higher, half lower
230 ft70 m
Highest point
Inside town limits, on the northwest side
280 ft85 m
Lowest point
Inside town limits, on the south side
180 ft55 m
Town center
USGS map point for Gantt
230 ft70 m
Airport (79J)
FAA airport elevation, the highest point of its runways, 8.1 mi southeast of the town limits
310 ft94 m
Average of all land230 ft70 m

Elevation profile, south to north

1.5 mi south to north through the town center.

Topographic Map

Topographic elevation map of Gantt, Alabama, shaded from 180 ft on the south side to 280 ft on the northwest side
Town limits (dashed) over shaded terrain, with contours every 10 ft (3 m).
Location
Town in Covington County, Alabama, United States
Population
197 2024 est.
Land area
0.7 sq mi
Density
303 per sq mi
Coordinates
31.4068° N, 86.4841° W
Time zone
Central UTC−6 / −5
Landform region
Coastal Plain
Drains to
Conecuh River → Escambia River → Gulf of America
Airport
South Alabama Regional at Bill Benton Field (79J) 310 ft
ZIP codes 2
36038 36421
⤓ Download this map

WebP, 1200 × 900. Free to use: credit “ElevationOf.com” with a link to this page.

Sources: U.S. Census Bureau, USGS, FAA

Nearby Places

How we measure
  • Typical elevation: the population-weighted median: every 2020 Census block inside the town limits, at its USGS 3DEP height, weighted by the people who live there. Half of residents live higher, half lower.
  • Lowest, highest, average: USGS 3DEP bare-earth heights on a 1 arc-second (≈100 ft, 30 m) grid, land only, inside the Census town limits (TIGER, Jan 1 2026).
  • Nearby Places: nearby towns and rankings use each town's typical elevation, so every town is compared like for like. Rankings count every city, town, township and census-designated place, including places inside a town. Peaks and hills: the nearest summits with at least 980 ft (300 m) of prominence within 62 mi (100 km), then federal (GNIS) summits within 16 mi (25 km) when there are fewer than 5; each is the 3DEP top on a ~7 ft (2 m) window, or the NGS published height when a usable survey mark sits within 160 ft (50 m) of it (shown as published).
  • Rounding: computed heights are rounded to 10 ft (5 m), or to 1 ft (1 m) under 100 ft; 3DEP is good to about a meter, not a foot. Published figures (FAA airport elevation, NGS survey heights) are shown as their publisher gives them.
  • Datum: North American Vertical Datum of 1988 (NAVD 88). NGS plans to replace NAVD 88 with a new datum (NAPGD2022); heights will then shift slightly.
  • Sources: USGS 3DEP, GNIS, Watershed Boundary Dataset and physiographic provinces; U.S. Census Bureau (boundaries, 2020 blocks, 2024 population estimates, Gazetteer areas, ZIP code areas); FAA airport data; BTS time zones. All public domain.